Skip to content

Security assessments for industrial networks, connected devices and datacenters, planned around safety and uptime

ICS and SCADA assessments, IT/OT segmentation, firmware and OTA review, and datacenter change evidence, passive and configuration-led first.

Discipline: OT, IoT and datacentersPricing: scoped after discovery

The situation

Industrial networks grew over decades: PLCs, HMIs, engineering workstations and historians that cannot be patched on IT schedules, connected to corporate networks for vendor remote access, reporting and cloud analytics. Connected devices run firmware your team inherited, with update paths designed under deadline.

In the datacenter, hypervisors, virtual networks and storage change every week. The change ticket says what was planned. Nobody records what the configuration looked like before and after.

What it costs

One flat route from an office laptop or a vendor jump host to a controller turns an IT incident into an operational one. Firmware without verified signatures or rollback protection lets an attacker, or a bad update, take devices offline in the field.

Careless testing is a risk of its own: an active scan can crash a legacy controller. In these environments the assessment has to be planned around safety and uptime, not around a scanner’s defaults.

Undocumented drift in virtual networks and host configuration breaks segmentation without anyone noticing, and after an incident there is no record of which change opened the path.

What we assess and build

ICS and OT

  • Asset and dependency maps built from architecture documents, configuration exports and passive traffic capture
  • IT/OT segmentation review: zones and conduits, firewall rules, remote access, vendor connections and jump hosts
  • ICS and SCADA assessment of PLCs, HMIs, engineering workstations, historians and the protocols between them
  • Industrial applications: historians, MES, SCADA servers and their web and API interfaces

IoT and embedded

  • Firmware analysis: embedded secrets, debug interfaces, outdated components, update verification
  • OTA update design: signing, key custody, rollback protection and recovery from a failed update
  • Device-to-cloud identity and API authorization

Datacenter and virtualization

  • Hypervisor, virtual network and management plane configuration review
  • Topology and configuration drift: what changed between two points in time, compared with what the change record approved
  • Change evidence records that hold up in an incident investigation

Work is passive and architecture- or configuration-led first. Active testing runs only in a test environment or lab, or inside a maintenance window approved in writing by the operations owner, under written rules of engagement. We align the work to IEC 62443 and NIST SP 800-82 where they apply. Neither is a certification we hold or grant.

Technologies we work with

Tools we configure, tune and read output from. Listing them does not imply a partnership.

  • Modbus/TCP
  • DNP3
  • OPC UA and OPC DA
  • IEC 61850
  • PROFINET
  • EtherNet/IP
  • VMware vSphere and NSX
  • Wireshark

How the work runs

  1. Step 1: Agree the safety rules

    Systems in scope, what may be touched and how, maintenance windows, stop conditions and the operations contact with authority to halt work. Signed before any access.

  2. Step 2: Map from documents and configuration

    Network diagrams, firewall and switch configurations, asset lists, firmware images and virtualization exports become the first asset and dependency map.

  3. Step 3: Observe passively

    Traffic capture from span ports or taps confirms the map, finds undocumented connections and shows which protocols cross zone boundaries.

  4. Step 4: Test where it is safe

    Firmware analysis on extracted images, testing in the lab or test environment, and active checks in production only inside approved windows.

  5. Step 5: Prioritize with operations

    A remediation roadmap ordered by consequence and by what operations can change, with an owner and a target maintenance window for each item.

What you receive

Rules of engagement
Scope, permitted techniques, windows, stop conditions and contacts, signed by the operations owner.
Asset and dependency map
Devices, applications and the connections between them, with the source of each entry.
Zone and conduit review
Each cross-zone path, the rule that allows it, and whether it should exist.
Bounded assessment report
Findings with consequence and fix, and a plain statement of what was and was not tested, and how.
Firmware and OTA findings
Issues in images and update design, with the fix and how to verify it on devices in the field.
Drift and change evidence report
Configuration differences between snapshots, matched to approved changes or flagged as unexplained.
Remediation roadmap
Items ordered by consequence, tied to owners and maintenance windows.

What we measure

We agree a baseline for each measure in the first weeks and report against it. We do not promise target numbers before we have seen your data.

MeasureHow it is counted
Mapped cross-zone pathsConnections between IT and OT zones that are documented, justified and owned.
Controlled remote accessRemote and vendor access paths with a named owner, individual accounts and an agreed control.
Verified update chainDevice families whose OTA path verifies signatures and blocks rollback, confirmed by test.
Explained driftConfiguration differences between snapshots that trace to an approved change record.
Roadmap progressRoadmap items closed in their planned maintenance window.

Scope boundaries

What this engagement does not include, and what needs written authorization first.

  • No active scanning or testing of production control systems without a safety review and written approval from the operations owner.
  • Safety instrumented systems are reviewed from documentation and configuration only, unless the asset owner agrees otherwise in writing.
  • Changes to control systems are made by your operations team or integrator, through your change process.
  • Site access, travel and safety induction requirements are agreed per site.
  • We do not certify compliance with IEC 62443 or any other standard. The output can serve as evidence for your assessors.

Sample deliverable

Zone and conduit findingIllustrative example, not client data
ID          OT-021
Conduit     Corporate IT -> Level 3 historian -> Level 2 control
Source      Firewall export FW-OT-01; passive capture, 72 h, span
Observed    Vendor VPN lands on the IT network; jump host has RDP
            to the historian; historian holds OPC DA sessions to
            two HMIs on Line 2
Gap         No conduit rule limits the historian to read paths;
            jump host shared by three vendors on one account
Consequence A compromised vendor account can reach HMIs that
            write setpoints on Line 2
Tested      Configuration and passive capture only. No active
            probes on Level 2, per rules of engagement
Fix         Per-vendor accounts with MFA on the jump host;
            historian replica in the DMZ; read-only rule to Level 2
Owner       OT engineering       Window: planned shutdown, Q1
The format we use in real engagements. Names, identifiers, dates and values are invented for this page.

Where this applies

Questions buyers ask

Will your testing disrupt operations?

The plan is built to avoid it. Work starts from documents, configuration and passive capture. Anything active runs in a test environment, a lab or an approved maintenance window, with stop conditions and an operations contact who can halt it.

Are you IEC 62443 certified?

We align assessments to IEC 62443 and NIST SP 800-82 and map findings to their requirements where that helps. We do not certify systems or organizations; certification comes from accredited bodies.

What do you need from us to start?

Network diagrams, firewall and switch configuration exports, an asset list if one exists, and a named operations contact. Missing documents are expected. Building the map is part of the work.

Do you cover datacenters as well as plants?

Yes. Hypervisors, virtual networks and management planes get the same approach: configuration first, then a comparison of snapshots against your change records, so every difference has an explanation or an owner.

Map the paths before anyone tests them.

Tell us about the site or product, what connects to what, and your next maintenance window. We will propose a scope that operations can sign.